Scope
- Capacity, power and thermal load calculations
- Rack layout with hot/cold aisle design
- Power distribution (PDU), redundancy and earthing
- Structured cabling and fibre backbone
- DCIM monitoring, sensors and alarms
- Commissioning tests and as-built documentation